From Wisconsin Department of Natural Resources <[email protected]>
Subject NEWS RELEASE: Samers Bay Breakwall Project To Resume In February
Date February 2, 2026 4:03 PM
  Links have been removed from this email. Learn more in the FAQ.
  Links have been removed from this email. Learn more in the FAQ.
DNR News Release Header Image [ [link removed] ]




*FOR IMMEDIATE RELEASE: *Feb. 2, 2026
*Contact: *Angelo Cozzola, DNR Fisheries Biologist
[email protected] or 920-410-9170

 

 Samers Bay Breakwall Project To Resume In February

 

*MADISON, Wis.* – The Wisconsin Department of Natural Resources (DNR) today announced construction efforts on the Samers Bay breakwall project are planned to resume this winter, with a portion of the construction likely to occur during the sturgeon spearing season [ [link removed] ].

The main objective of the project is to install an offshore breakwall on the north side of Samers Bay on Lake Butte des Morts to protect, preserve and restore fish and wildlife habitat. Marsh and wetland areas throughout the Upriver Lakes have faced extensive degradation due to water levels leading to erosion from wind, wave and ice energy.

Located approximately 1,000 feet offshore, a total of 11 breakwall segments will provide an area protected from the lake's energy to allow aquatic plants to establish, providing aquatic habitat and promoting water quality.

Construction equipment will access the project site from the Butte des Morts Conservation Club property on the south side of Terrell Island. Spearers may encounter construction during the spearing season, which opens Feb. 14.

The ability to conduct this project and its exact timeline will be dependent on ice conditions in the area.

This project is led collaboratively by local groups including the Butte des Morts Conservation Club, Winnebago County Land and Water Conservation Department,  Fox Wolf Watershed Alliance and the Wisconsin DNR.

Segments 6 through 11 have been installed or partially installed through previous efforts, and the upcoming effort aims to finish construction on existing segments and install segments 1 through 5, completing the project.

The start and end GPS coordinates for each of these breakwall segments are:

 

Start Coordinates



End Coordinates



Segment 1



44.06815372, -88.67782864



44.06759221, -88.67615059



Segment 2



44.06755127, -88.67594163



44.06711995, -88.6741973



Segment 3



44.06706186, -88.67399188



44.06656089, -88.67399188



Segment 4



44.06649153, -88.67208816



44.06587084, -88.67045798



Segment 5



44.06581134, -88.67025353



44.06575677, -88.66841656



Segment 6



44.06577564, -88.66819333



44.06602738, -88.66638052



Segment 7



44.06606026, -88.66618251



44.06646543, -88.66435678



Segment 8



44.06653465, -88.66416934



44.06715426, -88.6626337



Segment 9



44.06723222, -88.66244292



44.0678852, -88.6606879



Segment 10



44.06794322, -88.66051259



44.06869814, -88.65908492



Segment 11



44.06881398, -88.65889119



44.0697732, -88.65772948








________________________________________________________________________

[ [link removed] ]

[ [link removed] ]

[ [link removed] ]    [ [link removed] ]     [ [link removed] ]  [ [link removed] ]

[ [link removed] ] Update your subscriptions, modify your password or email address, or stop subscriptions at any time on your Subscriber Preferences Page [ [link removed] ]. You will need to use your email address to log in. If you have questions or problems with the subscription service, please visit subscriberhelp.govdelivery.com [ [link removed] ].


________________________________________________________________________

This email was sent to [email protected] using GovDelivery Communications Cloud on behalf of: Wisconsin Department of Natural Resources · 101 S. Webster Street · Madison, WI 53707-7921 · 608-266-2621 GovDelivery logo [ [link removed] ]
body .abe-column-block { min-height: 5px; } table.gd_combo_table img {margin-left:10px; margin-right:10px;} table.gd_combo_table div.govd_image_display img, table.gd_combo_table td.gd_combo_image_cell img {margin-left:0px; margin-right:0px;} table.govd_hr {min-width: 100%;} p, li, h1, h2, h3 { overflow-wrap: normal; word-wrap: normal; word-break: keep-all; -moz-hyphens: none; -ms-hyphens: none; -webkit-hyphens: none; hyphens: none; mso-hyphenate: none; }
Screenshot of the email generated on import

Message Analysis